No. 1351
NEW SIGNAL AT CONNEL FERRYTo facilitate the Contractor's operations at this place a temporary Siding has been put in and a Ground Signal erected. SIDING SIGNAL.- The Signal from the Siding to the Main Line stands outside the Siding about 95 yards East from the Signal Frame.
To come into operation on Monday, the 1st day of June, 1903.
|
|