Home Page > Ardsheal Quarry

Ardsheal Quarry

(1903–????)


Summary

This siding lay within the Kentallen to Ballachulish tablet section, near the 89 mile post. The siding was on the east side of the single line. It was only worked by Down direction trains.


Thursday, 20 August 1903

Line opened between Connel Ferry and Ballachulish. Siding opened.

View Signalling Notice


Ardsheal Quarry (1903)
Ardsheal Quarry (1903)

????

Siding closed.